Understanding Development Finance: A Guide for First-Time Developers

Tower crane emerging from morning fog
PublishedJuly 2026
Reading7 minutes
TopicDevelopment finance

Your first development is the hardest one to fund. You have no track record to point to, the numbers are untested, and every funder wants to know the same thing: will this project get built and sold?

Understanding how development finance is structured makes that conversation much easier.

The stages of development finance

1. Site acquisition

Funding to buy the land, often before planning approval. Funders lend against the site’s current value, so leverage is lower than for an approved site.

2. Construction

The main facility. It is drawn down in stages as the build progresses, each draw checked by a quantity surveyor, and sized against the project’s total cost and its expected end value.

3. Completion and residual stock

Once the project is finished, a residual stock facility can repay the construction loan while the remaining units are sold, giving you time to sell well rather than fast.

How much can you borrow?

Construction funders typically measure leverage two ways: against the total project cost (loan to cost) and against the completed value (loan to gross realisation). Senior debt covers most of the cost; the developer’s equity covers the rest. Where the equity gap is too large, a second-ranking mezzanine facility or a stretch-senior structure can bridge it, at a higher price.

What funders assess on a first project

  • Feasibility. Realistic costs, sale prices backed by evidence, and a contingency.
  • The team. An experienced builder on a fixed-price contract, a project manager and consultants who have done this before. For a first-time developer, the team is the track record.
  • Equity. Your own money in the deal, in cash or in land value.
  • Presales. Banks often require them; private funders may not, which is one reason first-time developers use private capital.
  • Exit. How the loan is repaid: sales, a refinance or holding the finished asset.

Common mistakes

  • Optimistic sale prices with no comparable sales behind them.
  • No contingency for cost overruns or delays.
  • Approaching funders before the builder and the numbers are settled.
  • Underestimating interest. On a capitalised facility, interest is a project cost and belongs in the feasibility.
We fund site acquisition, construction and residual stock for developers at every stage, from first projects to established builders. Property & development funding.